| Our treks | 8000m peaks | Tibet tours | Contact us | About us | Photos & Diaries |
Dispatch homeProject Himalaya
|
More Everest BC timeWe are getting established. Project HimalayaThe Project Himalaya team have been waiting at Lukla and should, with a little luck, be in Kathmandu. Everest Peace Project 20 AprilWe are settling in BC now and after a couple of nights of Diamox and Paracetamol now everyone is sleeping well drug-free. It always takes a few days to get used to the large jumps in altitude, and that is why we will stay at the base camp, 5150m, for almost a week.
Dudu at dinner, a red soup night.
Micha, always sharp
Namgyal showing Lance video of the sherpa puja. We will have a puja at ABC.
The weather clearing after 3 days of snow (19 April, evening) Tonya says: Everest looms over us, she is HUGE. You can’t help but look up at her constantly. She is not intimidating, in fact I have the opposite problem of thinking it looks totally doable. We are looking at a lot of rock and very little snow. The flume is actually the most intimidating thing we see each day. The winds must be at least 100mph up there right now. |
21 AprilWe took a day trip down to Rongbuk Monastery to test acclimatization, and had great views of Everest all the way.
Tonya feeling good on the day trip to Rongbuk Monastery; Namgyal beside her |
|
|
21 April: Sadly Pasang Dorje, one of the Project Himalaya climbing sherpas has a bad stomach ulcer and so we arranged an evacuation to Tingri for him today, and he will go to Zhangmu tomorrow and get more treatment there. jdesign -- all rights reserved -- 2006 |